top of page

GSCDD Only Page

Keep this page bookmarked for yourselves, to monitor the Staff Gauge project.

VIDEOS BELOW

Staff Gauges Work Schedule.jpg

Staff Gauge Project Photos

Site 1 - Weir 1

1 - Weir 1, B.jpg
1 - Weir 1, A.jpg

Site 2 - Weir 2 Upstream

2 - Weir 2 Upstream, B.jpg
2-Weir 2 Upstream, B.jpg

Site 3 - Weir 2 Downstream

3-Weir 2 DwnStrm, B.jpg
3-Weir 2 DwnStrm, A.jpg

Site 4 - Weir 3 Flow-way

4-Weir 3 FloWay, A.jpg
4-Weir 3 FloWay, B.jpg

Site 5 - Weir 4 Gateway Hole 16

5-Weir 4 GW Hole 16, A.jpg
5-Weir 4 GW Hole 16, B.jpg

Site 6 - Weir 5 Gateway Greens

6-Weir 5, GW Greens, A.jpg
6-Weir 5, GW Greens, B.jpg

Site 7 - Stoneybrook

7-Stoneybrook, A.jpg
7-Stoneybrook, B.jpg

Site 8 - Hampton Park

8-Hampton Pk, B.jpg
8-Hampton Pk, A.jpg

Site 9 - Lake 114 "Swimming Pool"

9-Lk114, B.jpg
9-Lk114, A.jpg

Site 10 - Timber Creek East

11-TimberCreek, East, A.jpg
11-TimberCreek, East, B.jpg

Site 11 - Timber Creek West

11-TimberCreek, West, B.jpg
11-TimberCreek, West, A.jpg

Site 12 - Lake 79

12-Lake 79, B.jpg
12-Lake 79, A.jpg

CLICK ---->
to see approved Staff Gauge drawings

Here are some pictures of the folding mast bracket we've put in at Weir 1.

20260618_090108.jpg

Note the boat crank, stainless steel cable and pulleys for lowering mast.

20260616_155929 - Copy.jpg

We got the solar panel and rain gauge up about 12 ft, hopefully out of danger forever!

20260618_085501 - Copy.jpg

Here is the mast in lowered postion, for maintaining the solar panel and rain gauge.

Crank and cable - Copy.jpg

For extra tamper-proofing, the crank handle has been removed (stored in the SCADA box), and a nut and bolt installed to prevent the crank lock from being disengaged.

Staff Gauge Project;
PURPOSE
17 MIN

This video describes the whole purpose of the Staff Gauges, and how you'll use them.  It also explains the need for maintenance of the water level recording stations, along with their $16,000 annual cost ($4,000 / quarter).

Staff Gauge Project;
SURVEYING 101
13 MIN

If you want to know, this video describes the purpose and use of Benchmarks, along with how we transfer their levels to a location we need for the new Staff Gauges.

Staff Gauge Project;
DATUMS
13 MIN

This video describes further details on what a DATUM means when referring to your Staff Gauges, and why they will have NAVD88 displayed on them.

High Sights, Inc.

P.O. Box 354653, Palm Coast, FL.,  32135

Letterhead, Logo and shadow.jpg

Engineered SCADA Solutions

Contact Us

Thanks for submitting!

bottom of page